The Floor System
Repair, profile, prime, build, topcoat — and the moisture testing that decides whether any of it holds.
Request the Technical Data SheetsWhy It Is a System and Not a Product
A single-product floor coating has to be moisture tolerant, high-build, impact resistant, chemically resistant, UV stable, fast curing, and cheap. No chemistry is all of those at once. Every one-bucket warehouse floor coating on the market is a compromise, and the compromise usually shows up in the second winter.
Splitting the job across layers removes the compromise. OR-E41 epoxy primer only has to wet into the profile and tolerate residual slab moisture. OR-621 basecoat only has to carry film build and absorb impact. OR-75DCL, a polyaspartic, only has to be the wear and chemistry surface — and because it does not have to be the adhesion layer, it can be formulated for cure speed and UV stability instead.
That is why a properly sequenced system returns a bay to forklift traffic on a same-day schedule while a thick single-coat epoxy is still soft on day three.
System Components & Typical Specification
| Property | Value |
|---|---|
| Joint & spall repair | Concrete Mender — structural, penetrating |
| Primer | OR-E41 epoxy primer |
| Basecoat | OR-621 |
| Topcoat | OR-75DCL polyaspartic (or OR-ACR-42) |
| Required concrete profile | CSP 3–5 (diamond grind or shot blast) |
| Moisture vapor emission test | ASTM F1869 calcium chloride |
| Internal relative humidity test | ASTM F2170 in-situ RH probe |
| Typical light-duty build | 15 – 25 mil total system |
| Typical warehouse / forklift build | 30 – 60 mil total system |
| Heavy industrial / chemical build | 60 – 125 mil total system |
| Slip resistance | Broadcast aggregate into OR-621, locked by topcoat |
| Topcoat UV stability | Polyaspartic — will not amber like epoxy |
| Foot traffic | Typically same day |
| Forklift / rolling traffic | Typically next shift |
| Full chemical cure | 5 – 7 days |
Concrete Preparation
Profile. The slab must be opened to CSP 3–5 by diamond grinding or shot blasting. Acid etching does not reliably produce that profile on a hard-troweled warehouse slab and leaves residue behind. If you can wipe a finger across the prepped floor and get chalk, the prep is not done.
Moisture. Test before you spec. ASTM F1869 calcium chloride gives you a vapor emission rate in pounds per 1,000 sq ft per 24 hours; ASTM F2170 gives you internal relative humidity from an in-situ probe. Slab-on-grade without a functioning vapor retarder — which describes a great many older warehouses — can drive numbers that will blister any coating not primed for it. That is a design decision, not a field surprise, and OR-E41 exists partly to handle it.
Joints and cracks. Everything gets treated before the primer goes down. Saw-cut control joints, cold joints, spalled edges, and popouts are repaired with Concrete Mender, which penetrates into the surrounding matrix and cures into it. Unlike a semi-rigid filler dropped into a void, the repair carries load across the joint edge rather than sitting inside it.
Contamination. Oil, hydraulic fluid, and forklift battery acid all have to come out before profiling, not after. A degreased and then ground floor is clean; a ground and then degreased floor has driven the contamination into the open profile.
OR-75DCL or OR-ACR-42?
OR-75DCL is the default topcoat for most warehouse work. Polyaspartic chemistry, UV stable so it will not amber under skylights or near dock doors, fast enough to hand a bay back the same day, and hard enough to take hard-tire wheel traffic without burnishing.
OR-ACR-42 is specified where the chemical exposure profile or the installation window points a different direction. Some spill environments and some overnight-only work schedules favor it.
Send us the exposure list — what actually gets spilled, how often it gets scrubbed, what the wheels are made of, and how many hours you can give us — and we will tell you which topcoat the floor wants. We would rather spec the correct one than the more expensive one.
Need TDS and SDS Sheets for a Submittal?
We will send complete technical data, safety data, and application instructions for every component in the system, plus a written spec you can put in front of an owner.
Request DocumentationGet a Floor Spec & Budget Number
Tell us about your project and we will follow up with product details, technical data sheets, and pricing.